2019

Works at the Serednodniprovska HPP

September 2019

STC ENPASELECTRO Ltd. carried out a complex of works in supply, installation and commissioning of Л-88 and Л-89 line protection.
Installation and commissioning works on line Л-89 are completed, protection is put into operation.
The work was performed at a high professional level, in accordance with current technical standards and on schedule.

foto 2019-10-25

Contacts:

Phone/Fax:+380(44) 456-26-16
E-mail: enpas@enpaselectro.com
Website: www.enpaselectro.com
Facebook: https://fb.me/enpaselectro/

04112, Kyiv, Ukraine
Igor Sikorsky st 8, Block A, 2nd floor