Specialists of STC ENPASELECTRO together with the station's personnel and with the participation curators of the automation department RDC of the South-West Region of the NEC Ukrenergo performed сommissioning and put into operation the automation cabinet for the elimination of the asynchronous regime (ALAR) line 330 kV of internation commissioning al importance "Dnestrovskaya HPP - Beltsy", which provides electricity to part the Republic of Moldova and the south of the Odessa region.
ALAR is used to troubleshooting hazard phenomenas, which arise as a result of a violation of the stability of the parallel operation of power plant units, whole power stations and parts of integrated power system.
The cabinet ALAR is executed on the basis of the device "Diamant" produced by RPI Hartron-Inkor.